Basic Prerequisites: 04 · Expected Shortfall.
1. Intuition & Practical Objective
VaR and ES are mathematically clean but operationally treacherous. This page names the three failure modes precisely, so a risk manager knows which assumption to distrust and how the failure shows up in money terms. The objective is not cynicism - it is the discipline of knowing exactly where each number is an approximation so the residual can be measured and managed.
The three failures, in one line each:
- Tail blindness - a quantile is insensitive to the magnitude of the worst outcomes (VaR), and even ES only reports their mean.
- Non-coherence - VaR breaks subadditivity and convexity, so it cannot be safely optimised or decentralised.
- Estimation error - both measures are estimated from finite (and quiet-period) samples; the estimates carry standard errors large enough to flip decisions.
2. Mathematical Ground Truth & Derivations
Tail blindness (exact). VaR is the -quantile. Changing the loss in any outcome already beyond leaves VaR exactly unchanged, because the quantile depends only on the ordering up to rank , not on the values past it. Concretely, with a -observation sample the VaR is the th order statistic (index in a 0-based sort) sorted loss: the th, th, th (the truly catastrophic days) do not enter. ES does enter them:
So a single worst-day escalation from to moves a ES (over tail points) by , and moves VaR by . That asymmetry is the definition of tail blindness.
Estimation error (organisation). For a sample of size , the density-quantile standard error of is
It shrinks like - slowly. In the normal case at we measured at , at , at . ES averages the tail and is noisier still in small samples, because - and hence and the effective tail count - is exactly what is hard to estimate.
Window truncation. Historical-simulation VaR over a fixed window assigns zero probability to any loss larger than the window’s maximum. A -day window drawn from a calm period reports a VaR lower than the true tail admits, and there is no data point to correct it. This is the same pathology as EVT’s threshold problem seen from the other side.
Backtesting. A risk model is a forecast and must be graded (Hull §22.7). Two standard tests:
- Kupiec POF (1995) - unconditional coverage: do exceptions occur at the promised rate? A likelihood-ratio test on the count of breaches.
- Christoffersen (1998) - conditional coverage: exceptions must also be independent (no clustering). A model that blows through its VaR in bursts fails even if the average rate is right. The 1996 Basel framework encodes this as the traffic-light backtest (/-day; green , yellow –, red exceptions), with the capital multiplier rising through the zones (BCBS 1996).
3. Computational Implementation - estimating the estimator
We (a) measure the sampling standard deviation of VaR and ES across resamples for increasing , and (b) demonstrate tail blindness by changing only the single worst loss. Stdlib only.
Panel (A): the standard error falls only as , and ES’s is larger than VaR’s at every sample size - the coherence/estimation trade-off made concrete. Panel (B): VaR literally cannot see the worse tail; ES records it.
4. Failure Modes & First-Principles Breakdowns
- Tail blindness → “picking up nickels in front of a steamroller.” A portfolio optimised against a VaR constraint loads on strategies with small steady gains and hidden catastrophic tails (selling deep-OTM puts, short-vol carry) that sit past the quantile (01 · §4). Fix: constrain ES, not VaR.
- Non-coherence → aggregation and governance failure. Subadditivity failure means firm-level VaR is not bounded by the sum of desk VaRs; capital “saved” by netting can be illusory (Artzner Axiom-S motivation; 03 · §2). Fix: coherent (ES-based) aggregation.
- Estimation error → decision flips on noise. At the VaR carries of pure sampling error; two desks with identical risk can report VaRs a quarter- apart. Backtest (Kupiec + Christoffersen) and average over longer/filtered samples.
- Window truncation → a calm window is a blindfold. Zero probability assigned beyond the sample max; the longer and quieter the calm, the worse (Hull §22.2). Fix: volatility-filtered historical simulation (FHS; McNeil–Frey) and EVT tail extrapolation.
- Discrete/short-horizon artefacts. With few tail points the discrete quantile convention ( vs , 02 · §2.1) and the ES boundary correction dominate; pin the convention in the policy.
- Procyclicality. Historical VaR/ES fall in calm markets (allowing more leverage) and spike after losses - a feedback loop supervisors counter with stressed VaR/ES (Basel II.5) and the FRTB liquidity-horizon scaling (06 · §Basel).
5. References
- Hull, Options, Futures, and Other Derivatives
- Kupiec, P., Techniques for Verifying the Accuracy of Risk Measurement Models, J. Derivatives 3(2):73–84 (1995)
- Christoffersen, P., Evaluating Interval Forecasts, International Economic Review 39(4):841–862 (1998)
- BCBS, Supervisory Framework for the Use of Backtesting… (1996, BIS)
- McNeil & Frey, Estimation of Tail-Related Risk Measures… (2000)
- Gneiting, T., Making and Evaluating Point Forecasts, JASA 106 (2011)