Basic Prerequisites: Statistics & Inference (quantiles, likelihood) and Value at Risk & Expected Shortfall (the number whose model risk this folder is about).
1. Intuition & Practical Objective
This page builds the why of model risk with no prior risk-management knowledge needed. The objective is one idea: a model is a toy, not the world; the risk you carry is not the model’s error in the abstract but the model’s error multiplied by your decision’s sensitivity to it.
Start with the dumbest honest question: if I have a risk model, what can go wrong? The tempting answer is “the model could be inaccurate.” That is true and useless. The useful answer decomposes the worry into things you can measure:
- The output is a point, the truth is unknown. A VaR of $10M is not a fact; it is one number produced by choosing a distribution, a window, an estimator. Change any one and the number moves. That movement is the model risk.
- Models are what you build when you cannot see the future. Derman’s observation: in physics the variables (mass, time) exist whether or not humans do; in finance the variables (expected return, volatility) are human expectations - hidden variables inferred, not observed. You are always extrapolating from a proxy.
- The failure is not symmetric with useful effort. Most modelling effort goes into precision (more factors, faster calibration); most model risk sits in assumption error (wrong functional form, wrong window, wrong dependence). Precise answers to the wrong question are the signature of a model-risk event.
Three steps:
- Same data, different defensible models, materially different numbers. Feed one realistic (fat-tailed) sample to three textbook-defensible VaR estimators - parametric-normal, historical, and peaks-over-threshold EVT - and watch the number differ by up to . Nobody made a mistake. That gap is model risk.
- Model risk lives in the tail. The three estimators agree closely at the quantile and diverge wildly at , because that is where no estimator has data and every estimator substitutes an assumption for evidence.
- Managing model risk is not “getting the right model”; it is bounding the decision’s exposure to being wrong - a validation process, an error budget, a conservative add-on, and an organisational authority to say “do not use this”.
2. Mathematical Ground Truth & Derivations
A model, formally. A valuation/risk model is a map from inputs and parameters (estimated from data or implied) to an output (price, VaR, capital). The true quantity is . The model error is
Model risk is the distribution of induced by uncertainty in (i) the functional form , (ii) the parameters , (iii) the implementation, and (iv) the use. SR-11-7’s two causes map onto this directly: fundamental error (i–iii) and misuse (iv).
Quantile model risk. For a loss with CDF , the -quantile (VaR) is . Two models give . The relative model risk is
Because the density thins in the tail, grows with - the same two models can agree to at the median and disagree by at . Formally, if the two models differ by a slowly-varying ratio in the tail (a differing tail index ), then : the discrepancy is power-law amplified in . Tail indices are exactly what data-poor quantiles estimate worst - hence the amplification.
The peaks-over-threshold (POT) estimator used below (Pickands–Balkema–de Haan): above a high threshold the excess distribution is approximately Generalized Pareto, . With exceedances in observations, the quantile is
and a method-of-moments fit gives , from the exceedance mean and variance . The normal estimator, by contrast, is - a single assumption about the tail shape.
3. Computational Implementation - one sample, three models
We draw i.i.d. returns from a Student- with degrees of freedom, scaled to unit variance (a standard fat-tailed proxy; ). We then estimate the , and VaR three ways: parametric-normal, historical (empirical quantile), and POT-GPD. Stdlib only, seeded, deterministic.
The move from to is the whole lesson in one line: the spread across three standard, defensible models grows from to purely as you ask the question where there is no data. At with , the historical estimate is essentially the single worst or second-worst observation - a sample of size one dressed as a quantile - while the normal estimator substitutes a thin-tailed assumption that the data reject. All three are “correct” implementations of different models. The gap is model risk.
4. Failure Modes & First-Principles Breakdowns
- Mistaking precision for accuracy. A model that reproduces its own inputs to six decimals feels trustworthy and says nothing about . The spread above exists between correctly coded estimators.
- The tail is an assumption, not an observation. Past the largest few observations, every quantile estimator is extrapolation; the choice of extrapolation rule (normal tail vs GPD tail vs empirical) dominates. Denying this is the first failure; recognising it is the start of this folder.
- Model independence is assumed, not tested. Two “independent” validators who share the same data, codebase and training will share the same blind spot and certify the same error - the illusion of diversity (develop this in 05 · Failure Modes).
- The decision, not the number, is what is at risk. A VaR error matters only through leverage, limits and capital it drives. Always convert model error into the decision it changes - that is the error budget of 02 · Sources of Model Risk.
5. References
- Derman, E., Model Risk, Goldman Sachs QSR Notes (1996) - “Models translate opinions into values”, “Uncertainty is fundamental”, “A model is only a model…“. Read in full from the corpus PDF.
- Federal Reserve / OCC, SR 11-7 (2011)
- McNeil, Frey & Embrechts, Quantitative Risk Management (2015)
- Embrechts, Klüppelberg & Mikosch, Modelling Extremal Events (1997)
6. Connected Graph Bridges
- Base: Value at Risk & Expected Shortfall · Statistics & Inference
- Continue: 02 · Sources of Model Risk · Index Hub