Basic Prerequisites: VaR & Expected Shortfall and 02 · Market vs Funding Liquidity.


1. Intuition & Practical Objective

Value at Risk is built on a lie of convenience: it assumes you can liquidate the whole position in zero time at the mid price. Neither clause is true. This page removes them, one at a time, and rebuilds VaR into a liquidity-adjusted VaR (L-VaR):

The objective is the decomposition itself: know which component dominates, because the fix differs. If spread dominates, trade smaller/patiently; if impact dominates, the position is simply too large for the market and must be split over days.

Three ideas carry the page:

  1. Two liquidation costs, two mechanisms. The exogenous cost is the spread and its variability - independent of your size. The endogenous cost is your own market impact - it grows with the square of your size, because both the number of shares and the price concession per share rise with .
  2. The liquidation horizon is a risk multiplier. Liquidating over days means you are exposed for days, so market risk scales like - but the schedule of forced execution adds cost that scales like in the worst (linear-impact) case. This is exactly why Basel’s market-risk horizon is 10 days, and why the FRTB introduces liquidity horizons that can be far longer for illiquid risk factors.
  3. L-VaR is a coherent upgrade of VaR, not a different animal. It keeps the quantile (so backtesting machinery survives) and adds a deterministic liquidation cost - the Bangia–Diebold–Schuermann–Stroughair (1999) construction.

2. Mathematical Ground Truth & Derivations

2.1 Exogenous liquidation cost (spread). Selling realises the half-spread plus a worsening of the spread itself in the tail. With relative spread and spread volatility , the -confidence liquidation cost on value is

The first term is the mechanical cost of crossing a normal quarter-spread; the second prices the realistic possibility that when you are forced to sell, the spread is wider than usual - the cost and the tail are correlated. This is the pillar’s established L-VaR form (see the flat liquidity note for the same formula in form).

2.2 Endogenous liquidation cost (market impact). With linear price impact (Foucault eq. 2.8) and depth shares to move the price by one unit, liquidating shares moves the price by . The volume-weighted execution price sits at the mid of the impact, so the shortfall per share is and

The is the whole story: doubling the position quadruples the impact cost. Equivalently, in return terms the impact drag is per unit of value traded.

Reality check on the exponent. Real impact is closer to square-root (Almgren–Chriss 2000 temporary impact; Bouchaud et al. 2009 “How Markets Slowly Digest Changes in Supply and Demand”: impact ). The linear model is the conservative-for-reasoning baseline used in risk-adjusted measures because (i) it is closed-form and (ii) at the sizes at which L-VaR matters, the quadratic overstates less than the linear-per-share model understates. Square-root impact is treated in 06 · Advanced Extensions and in the Pillar 6 microstructure refs.

2.3 The liquidation horizon. If the order may not exceed a fraction of average daily volume,

The horizon-matched market VaR is then under i.i.d. scaling (Hull §22.4) - and the L-VaR must be evaluated at that horizon, not at 1 day. The FRTB makes this explicit: each risk factor gets a liquidity horizon (10/20/40/60/120 days) and the ES is computed on the scaled shock .

2.4 The combined measure.


3. Computational Implementation - VaR, L-VaR, and the horizon

We decompose a $10M position’s 1-day 99% VaR into its three liquidity components, then show how each scales with the liquidation horizon. Stdlib only.

Interpretation: the impact cost ($25,000, 25 bp) exceeds the exogenous spread cost (15.8 bp) even for this ~$10M order - and total cost grows as , so a 5× larger order carries 5× the per-unit impact drag and ~25× the total impact cost. The horizon row shows the other multiplier: mis-specifying the horizon (1 day instead of 10) understates the market-risk term by .


4. Failure Modes & First-Principles Breakdowns

  1. Ignoring the horizon, then compounding it. Two separate errors live here: using a 1-day VaR for a position that takes 10 days to unwind (understates market risk by ), and omitting the liquidation cost entirely. The two do not cancel; they add.
  2. Assuming the spread is constant. prices the correlation between “I am forced to sell” and “the spread is wide.” Setting removes exactly the part that mattered in 2008.
  3. Linear impact at explosive sizes. understates for very large orders only if real impact is super-linear (it is not - it is sub-linear, square-root), so the quadratic model overstates for very large and can be conservative; but the linear slope is itself underestimated in calm periods, so the two errors run in opposite directions. Calibrate from stress-period data, not calm data.
  4. Level, not path, thinking. L-VaR prices the cost of a liquidation but treats the liquidation as one-shot. Patient execution (Almgren–Chriss optimal schedules) trades impact against timing risk; the realised cost can be above or below the static L-VaR depending on the path. See Optimal Execution.
  5. Non-coherence sneaks back in. Adding a size-dependent cost (convex in ) makes L-VaR super-additive in positions - the opposite of the subadditivity failure of plain VaR, and a reminder that “liquidity-adjusted” changes the aggregation properties that risk governance relies on.
  6. Currency of the horizon. ADV and are themselves state-dependent; in a crisis ADV collapses and shrinks simultaneously, so lengthens and rises - the two horizon terms move together (see 05 · Failure Modes).

5. References

  • Bangia, A., Diebold, F., Schuermann, T. & Stroughair, J. - Modeling Liquidity Risk, With Implications for Traditional Market Risk Measurement and Management (1999/2000)
  • Almgren, R. & Chriss, N. - Optimal Execution of Portfolio Transactions, J. Risk 3(2):5–39 (2000)
  • Bouchaud, J.-P., Farmer, J.D. & Lillo, F. - How Markets Slowly Digest Changes in Supply and Demand (2009)
  • Foucault, Pagano & Röell - Market Liquidity (2013)
  • Hull - Risk Management and Financial Institutions, liquidity-risk chapter (liquidity trading risk and L-VaR) and Options, Futures and Other Derivatives
  • BCBS - FRTB: Minimum Capital Requirements for Market Risk (2019, d457)

6. Connected Graph Bridges