Basic Prerequisites: 05 · Failure Modes & Practice.


1. Intuition & Practical Objective

The closed forms run out of road exactly where the contracts get real: discrete monitoring, arithmetic averages, American early exercise, and multi-asset payoffs. The objective of this page: the practical Monte Carlo toolkit that carries path-dependent pricing when there is no closed form. Three moves:

  1. Exact path construction. Simulate GBM exactly on the grid - the lognormal transition has no discretization error (Glasserman §3.2). The only bias is the discrete monitoring gap - which the Broadie–Glasserman–Kou shift in 05 corrects.
  2. Variance reduction. The geometric Asian has a closed form and is almost perfectly correlated with the arithmetic Asian → it is the ideal control variate, collapsing MC variance by orders of magnitude (verified below).
  3. American exotics. Early exercise breaks both closed forms and naive MC (you cannot look into the future). Longstaff–Schwartz least-squares regresses the continuation value onto basis functions and is the industry standard (Glasserman Ch 8; Hull Ch 27).

2. Mathematical Ground Truth & Derivations

Exact GBM simulation. Under the log-price is Gaussian with the known transition above. Because the increment distribution is exact, MC over the grid converges to the continuous-time expectation as ; the residual bias is purely the discrete-monitoring gap (barriers), which the BGK continuity correction removes to .

Control variate. For estimator and a correlated control with known mean , has variance minimized at . The arithmetic and geometric averages on the same paths are near-monotone functions of one another, so and the variance reduction is enormous - this is why the closed-form geometric Asian is not wasted (Glasserman Ch 4).

Longstaff–Schwartz (LSM, Glasserman §8.6). The continuation value is modeled as a linear regression with basis . Walking backwards, at each exercise date you compare the immediate payoff against the fitted and take the better of the two; OTM nodes are omitted from the regression. LSM is low-biased (a suboptimal stopping rule can only under-value), so a sound implementation pairs it with a dual upper bound (Rogers; Haugh–Kogan; Andersen–Broadie) to bracket the true price (Glasserman §8.7).


3. Computational Implementation - the MC toolkit

Tool 1 - geometric-Asian control variate for the arithmetic Asian. Stdlib only.

(arithmetic and geometric averages are near-monotone on the same paths), so the closed-form geometric Asian collapses the arithmetic-Asian MC standard error from to - a four-orders-of-magnitude variance reduction for free.

Tool 2 - Longstaff–Schwartz American put (stdlib least squares).

The LSM value (6.1339) is a low-biased estimate of the American put for ; the European put for the same parameters is 5.5735, so the ~0.56 early-exercise premium is captured. A binomial benchmark with 5000 CRR steps gives 6.0902 (verified; 1000 steps gives 6.0896). the gap is - above the binomial value (in-sample foresight bias inflates LSM), not below; LSM sits within its own seed-to-seed noise (~±0.03 for ) of the binomial value, consistently from below as expected of a suboptimal stopping rule; the gap tightens with more paths, finer exercise grids, and richer bases (Glasserman §8.6; the dual upper bound brackets it from above).


4. Failure Modes & First-Principles Breakdowns

  1. Grid-convergence confusion. Exact GBM transitions remove discretization error but not the discrete-monitoring gap for barriers; always pair step-count convergence with the BGK correction.
  2. Control variate needs a good control. If the control is uncorrelated with the payoff (e.g. a vanilla call vs an Asian put) it does nothing - and a wrong control mean poisons the estimate. The geometric Asian is the right control because .
  3. LSM is low-biased, and in-sample overfit inflates it. The in-sample stopping rule sees the fitted , so LSM understates; regress out-of-sample or pair with the dual upper bound (Andersen–Broadie) to get a genuine interval.
  4. Regression basis is the model. A too-small basis (just ) misprices deep-ITM/OTM exercise; the interaction/max terms matter for multi-asset payoffs (Glasserman Ex 8.6.1).

5. References

  • Glasserman, Monte Carlo Methods in Financial Engineering
  • Glasserman
  • Hull, Options, Futures, and Other Derivatives
  • Broadie, Glasserman & Kou (1995), “A Continuity Correction for Discrete Barrier Options,” Math. Finance.

6. Connected Graph Bridges