Basic Prerequisites: 05 · Failure Modes & Practice.
1. Intuition & Practical Objective
The closed forms run out of road exactly where the contracts get real: discrete monitoring, arithmetic averages, American early exercise, and multi-asset payoffs. The objective of this page: the practical Monte Carlo toolkit that carries path-dependent pricing when there is no closed form. Three moves:
- Exact path construction. Simulate GBM exactly on the grid - the lognormal transition has no discretization error (Glasserman §3.2). The only bias is the discrete monitoring gap - which the Broadie–Glasserman–Kou shift in 05 corrects.
- Variance reduction. The geometric Asian has a closed form and is almost perfectly correlated with the arithmetic Asian → it is the ideal control variate, collapsing MC variance by orders of magnitude (verified below).
- American exotics. Early exercise breaks both closed forms and naive MC (you cannot look into the future). Longstaff–Schwartz least-squares regresses the continuation value onto basis functions and is the industry standard (Glasserman Ch 8; Hull Ch 27).
2. Mathematical Ground Truth & Derivations
Exact GBM simulation. Under the log-price is Gaussian with the known transition above. Because the increment distribution is exact, MC over the grid converges to the continuous-time expectation as ; the residual bias is purely the discrete-monitoring gap (barriers), which the BGK continuity correction removes to .
Control variate. For estimator and a correlated control with known mean , has variance minimized at . The arithmetic and geometric averages on the same paths are near-monotone functions of one another, so and the variance reduction is enormous - this is why the closed-form geometric Asian is not wasted (Glasserman Ch 4).
Longstaff–Schwartz (LSM, Glasserman §8.6). The continuation value is modeled as a linear regression with basis . Walking backwards, at each exercise date you compare the immediate payoff against the fitted and take the better of the two; OTM nodes are omitted from the regression. LSM is low-biased (a suboptimal stopping rule can only under-value), so a sound implementation pairs it with a dual upper bound (Rogers; Haugh–Kogan; Andersen–Broadie) to bracket the true price (Glasserman §8.7).
3. Computational Implementation - the MC toolkit
Tool 1 - geometric-Asian control variate for the arithmetic Asian. Stdlib only.
(arithmetic and geometric averages are near-monotone on the same paths), so the closed-form geometric Asian collapses the arithmetic-Asian MC standard error from to - a four-orders-of-magnitude variance reduction for free.
Tool 2 - Longstaff–Schwartz American put (stdlib least squares).
The LSM value (6.1339) is a low-biased estimate of the American put for ; the European put for the same parameters is 5.5735, so the ~0.56 early-exercise premium is captured. A binomial benchmark with 5000 CRR steps gives 6.0902 (verified; 1000 steps gives 6.0896). the gap is - above the binomial value (in-sample foresight bias inflates LSM), not below; LSM sits within its own seed-to-seed noise (~±0.03 for ) of the binomial value, consistently from below as expected of a suboptimal stopping rule; the gap tightens with more paths, finer exercise grids, and richer bases (Glasserman §8.6; the dual upper bound brackets it from above).
4. Failure Modes & First-Principles Breakdowns
- Grid-convergence confusion. Exact GBM transitions remove discretization error but not the discrete-monitoring gap for barriers; always pair step-count convergence with the BGK correction.
- Control variate needs a good control. If the control is uncorrelated with the payoff (e.g. a vanilla call vs an Asian put) it does nothing - and a wrong control mean poisons the estimate. The geometric Asian is the right control because .
- LSM is low-biased, and in-sample overfit inflates it. The in-sample stopping rule sees the fitted , so LSM understates; regress out-of-sample or pair with the dual upper bound (Andersen–Broadie) to get a genuine interval.
- Regression basis is the model. A too-small basis (just ) misprices deep-ITM/OTM exercise; the interaction/
maxterms matter for multi-asset payoffs (Glasserman Ex 8.6.1).
5. References
- Glasserman, Monte Carlo Methods in Financial Engineering
- Glasserman
- Hull, Options, Futures, and Other Derivatives
- Broadie, Glasserman & Kou (1995), “A Continuity Correction for Discrete Barrier Options,” Math. Finance.
6. Connected Graph Bridges
- Back: 05 · Failure Modes & Practice · Index Hub
- Forward: Heston & SABR (the next layer of model risk) · Interest Rate & Term Structure Models
- Base: Stochastic Calculus & Itô · Black–Scholes–Merton & Feynman–Kac