Basic Prerequisites: Econometrics & Time Series (OLS regression, stationarity) and 01 · From Zero.


1. Intuition & Practical Objective

The event-study design is a precise timeline around a corporate announcement. The practical objective of this page: know exactly which windows exist, why each has its length, and how the market model converts raw returns into abnormal returns by estimating a firm’s sensitivity to the market out of sample.

Three windows (Brown–Warner 1985; Kothari–Warner 2007):

  1. Estimation window (e.g. days through , ~239 observations): a quiet pre-event stretch used to estimate the normal-return model’s parameters. It must end before the event so the parameters are uncontaminated.
  2. Event window (e.g. days through ): the days whose abnormal returns are measured. It brackets the announcement to catch pre-event leakage (partial anticipation) and post-event adjustment.
  3. Post-event window (optional, days onward): used to test efficiency - does the abnormal return persist after the announcement? (Persistent drift is inconsistent with efficiency.)

The market model (Sharpe’s single-index regression) is the standard expected-return model:

estimated by OLS in the estimation window. The abnormal return on each event-window day is then the prediction error:

Because daily expected returns are ~0.05% (Kothari–Warner §4.2), even a substantially misestimated barely changes a short-window abnormal return - which is precisely why short-horizon event studies are robust to the expected-return model (Brown–Warner 1985).


2. Mathematical Ground Truth & Derivations

The market model. Under the market model, the firm’s return is a linear function of the market return plus an idiosyncratic shock :

OLS in the estimation window gives the prediction for the event window:

Abnormal return = prediction error (Kothari–Warner eq. 1–2; Brown–Warner eq. 4):

Alternative expected-return models (Brown–Warner 1985, §3.2):

  • Mean-adjusted: (the firm’s own estimation-window average) - simplest, robust.
  • Market-adjusted: (expected return = the market return; forces ) - useful when the estimation window is too short for OLS.

Cross-sectional aggregation (Kothari–Warner eq. 3). The mean abnormal return at event time across sample firms:

The event window’s length is a design trade-off: a longer window (say ) captures slow price adjustment and partial anticipation, but admits more noise and contamination; a tight window (say ) maximizes power when the announcement date is precise (e.g. earnings announcements - Kothari–Warner §3.6).


3. Computational Implementation - the full market-model pipeline

Stdlib only. Estimates the market model in the estimation window, computes the event-day abnormal return, the CAR, and the t-statistic. The day-0 noise is zeroed so the injected +3% event is the only abnormal signal - a single firm, so the event-day t is modest (idiosyncratic noise dominates one firm; aggregation across firms fixes that, see 03).

Reading the output. The OLS market model recovers close to the true ; the event-day abnormal return is (the injected signal), but its t-statistic is only - one firm’s signal is swamped by its own noise (the neighbor days happen to be negative, so the 3-day CAR is negative). This is exactly why real event studies average over many firms (03), which restores the statistical signal.


4. Failure Modes & First-Principles Breakdowns

  1. Estimation window contaminated by the event. If the estimation window overlaps the announcement (or contains other value-relevant news), are biased and every abnormal return inherits the bias. Keep the estimation window clean and ending before the event.
  2. Event-window contamination. A second value-relevant event inside the event window (earnings + merger same week) gets attributed to the event of interest. This is the single most common source of biased CARs (05).
  3. Non-synchronous trading. With daily data, a thinly-traded stock’s return and the market return are measured over different intervals, so OLS is biased and inconsistent (Brown–Warner 1985 §2.2; Scholes–Williams 1977). Mitigate with lag/lead corrections.
  4. Wrong window length. Too long → noise and contamination dilute the signal (low power); too tight → you miss slow adjustment or pre-event leakage (partial anticipation shows up before day 0). Match the window to how precisely the announcement date is known.

5. References

  • Brown & Warner (1985), Using Daily Stock Returns: The Case of Event Studies, JFE 14(1)
  • Kothari & Warner (2007), Econometrics of Event Studies, Handbook of Corporate Finance
  • MacKinlay (1997), Event Studies in Economics and Finance, JEL 35(1)
  • Sharpe (1964), Capital Asset Prices, J. Finance 19(3)

6. Connected Graph Bridges